Eastwood Village Primary Project

Posted: 26 Aug 20
Eastwood Primary School Rotherham
 
Products - Fastec - Stainless Steel Balustrades and Glass

The post and glass infill balustrade on this project combines style and safety. The 3 storey primary school was built on stilts to address concerns over flooding and over dominance of surrounding properties. We think the finished school looks great.

The main frontage of the building was enhanced to perfection using Stainless Glass Clamps, whilst the 48mm posts and curved bar Handrail system added an eye-catching design element to finish off the project in style.

Have a similar project in mind? 

Complete our contact us form below with your project details and one of our experienced team will be in touch to assist you.